Skip to product information
1 of 1

D3 Diesel

Thoroughbred Injectors (7 AD Reman Injectors & 1 AE Long Lead Injector) - Late 99-03 Ford 7.3L (Built after 12/07/98)

Thoroughbred Injectors (7 AD Reman Injectors & 1 AE Long Lead Injector) - Late 99-03 Ford 7.3L (Built after 12/07/98)

SKU:

Regular price $1,236.00 USD
Regular price Sale price $1,236.00 USD
Sale Sold out
Taxes included. Shipping calculated at checkout.

Product Name: Thoroughbred Injectors (7 AD Reman Injectors & 1 AE Long Lead Injector) - Late 1999-2003 Ford Powerstroke 7.3L (Built after 12/07/98)
Manufacturer: Thoroughbred Diesel
Manufacturer Part #: AD/AE
Thoroughbred Diesel Part #: TDPAD/AE
Fitment Notes: Late 1999-2003 Ford Powerstroke 7.3L (Built after 12/07/98)

Need injectors for your 7.3? These Thoroughbred Diesel 7.3 injectors are fully remanufactured to above OE specifications and tested to provide you with a quality injector that will provide you with longevity and a great running truck!

Thoroughbred Diesel's 7.3 injectors begin their quality control at core teardown. Each core is ultrasonic cleaned and fully inspected. Then, all solenoids and tested and checked for proper resistance. Once those components have passed quality inspection and testing, our injectors are assembled with the new components and clearances are set to better than OE specifications. Finally, we test stand each injector to a full range of RPMS and oil pressures to ensure that overall performance is better than the day they were new! With this kind of quality, these injectors have a 2 year, unlimited mileage warranty for your piece of mind!

Thoroughbred Injectors Features:

NEW Tungsten Coated Barrels and Plungers
NEW Nozzles
All New, High Quality O-Rings
2 Year Unlimited Mileage Warranty

View full details